From live building data to a fixed fault
Chillers, air handling units (AHUs), fan coil units (FCUs), pumps
Energy meters and power panels
Zones, timers and occupancy-based switching
Tank levels and pumps, often monitored
Often monitored by the BMS; the fire system acts on its own
Door and entry status, where connected
Dashboard, alarms, reports
BACnet, Modbus
Local controllers near the equipment
Sensors, valves, dampers, fans, meters
The sensor reads 26 °C
Checked against the 24 °C setpoint
More cooling is needed
The chilled water valve opens
Cooler air reaches the room
Continuously, in working hours
Finds the controllers on the network.
Looks for frozen, impossible or drifting sensor values
Early warning, learned from normal running
Names the fault, with confidence and the readings that point to it
Expected load for this weather, time and occupancy
| Priority | Example | Deadline |
|---|---|---|
| P1 Critical | Valve stuck, fan belt failure | 4 hours |
| P2 Major | Faulty sensor, damper stuck | 24 hours |
| P3 Minor | Clogged filter | 72 hours |
Site survey and point list
Read-only connection to your BMS
Collect a few weeks of data
Tune the AI and agree success measures
Pilot on selected equipment
Which faults cost you the most today?